  • Software RFP: How to Write a Request for Proposal

Software RFP: How to Write a Request for Proposal

Home - JAN 2025
Karl Kjer
Ph.D. and Technical Writer
Karl Kjer, Ph.D. from the University of Minnesota, is an accomplished writer and researcher with over 70 published papers, many of which have received multiple citations. Karl's extensive experience in simplifying complex topics makes his articles captivating and easy to understand.
Software RFP: How to Write a Request for Proposal

When you outsource software development, one of the most important steps is to create a detailed and well-structured Request for Proposal (RFP). A software RFP helps you find the right vendors for your project by giving them clear guidelines and requirements. By streamlining the vendor selection process, RFPs let you make data-driven decisions that guarantee project success.

A software RFP outlines your organization’s requirements, objectives and expectations so vendors can submit proposals that address your specific needs. Although creating an RFP takes time, the benefits far outweigh the effort. This guide will show you how to write a software RFP and tips to improve your selection process.

What is a Software RFP?

A software RFP (Request for Proposal) is a formal document sent to potential software vendors outlining a company’s requirements and desired outcomes for a software development project. It’s a blueprint for vendors to create detailed proposals that address the company’s needs including proposed solutions, timelines, budgets and methodologies.

Software RFPs are essential for companies that want to outsource software development because:

  • Vendors understand the project scope and requirements.
  • Companies can compare proposals based on the same criteria.
  • Identify the most qualified vendors for the job.
  • Reduce the risk of misunderstandings and project failure.
  • Streamline the decision making process by providing structured answers.

Why You Need a Software RFP

While it may be tempting to skip the RFP process to save time, doing so can lead to misaligned expectations, poor results and wasted resources. Writing a thorough software RFP has many benefits:

  1. Clear Communication of Requirements: An RFP allows you to document your project’s specs, requirements and goals clearly. By giving vendors a comprehensive description of what you need, you minimize the chance of miscommunication and ensure your expectations are met.
  2. Streamlined Vendor Selection: An RFP lets you standardize the information you get from different vendors, making it easier to compare proposals. This structured approach helps you evaluate the pros and cons of each proposal better.
  3. Better Decision Making: With all the information presented in the same format, you can make more informed decisions based on the vendor’s expertise, experience and compatibility with your project requirements.
  4. Less Risk: A well-crafted RFP reduces the risk of project delays, cost overruns and poor solutions by clearly defining your expectations and evaluation criteria.
  5. Better Vendor Collaboration: Experienced software providers often expect a detailed RFP before they offer their services. Providing a good RFP will help collaboration and ensure everyone is aligned with the project goals.

How to Write a Software RFP

Creating a software RFP involves careful planning and documenting your requirements. Follow these steps to create a RFP that attracts the right vendors.

Step 1: Define Your Project Objectives and Scope

Start by outlining the purpose of the project and what you want to achieve. Clearly describe your company’s mission, the problem you are trying to solve and the desired outcome. Provide background information about your organization including your industry, size, structure and existing technologies.

Also specify the scope of the project including:

  • Functional and non-functional requirements.
  • Key performance indicators (KPIs).
  • Anticipated challenges and constraints.
  • Technology stack preferences (if applicable).
  • Project budget and timeline estimates.

Step 2: Choose Your Deployment Method

Decide whether your software will be hosted on-premises or in the cloud. On-premises deployment means using your own servers while cloud-based solutions are hosted by third-party providers. Explain your preferred deployment method considering factors such as scalability, security, integration with existing infrastructure and maintenance requirements. Clearly outline the pros and cons of each approach so vendors can understand your preferred setup.

Step 3: Outline Your Requirements

List all the technical and functional requirements needed for the software. This section is the core of your RFP and should be as detailed as possible. Your requirements may include:

  • Desired features and functionalities.
  • Compatibility with existing systems.
  • Performance expectations (speed, reliability, scalability).
  • Security protocols and data protection standards.
  • Maintenance and support requirements.
  • User access requirements and roles.
  • Integration with third-party applications or tools.

Step 4: Provide a Project Timeline

Specify a realistic timeline for your project including milestones and deadlines. Also set a clear deadline for vendors to submit their proposals. Break down your project’s development phases and provide estimated completion dates for each phase. Include details on how timelines may be adjusted if unexpected challenges arise and clarify your expectations regarding progress reporting from vendors.

Step 5: Define Evaluation Criteria

Clearly define how you will evaluate vendor proposals. This may include technical expertise, pricing models, previous experience, communication practices, adherence to security protocols and overall compatibility with your project vision. Include a scoring matrix or weighted criteria system to make the evaluation process transparent.

Sections to Include in Your Software RFP

A good software RFP should be comprehensive, clear and structured so vendors can respond accurately and efficiently. Below are the sections to include in your software RFP:

Executive Summary

Provide a brief overview of your company, the project objectives and the expected outcomes. Highlight the importance of the project and how it aligns with your company’s strategic goals.

Company Background

Describe your organization including its mission, vision, size, industry, market position and relevant past projects. This will help vendors understand your business environment and tailor their proposals accordingly.

Project Goals and Objectives

Clearly outline the specific goals and objectives you want to achieve with the software development project. Define both short-term and long-term objectives and what you want to achieve.

Scope of Work

Provide a detailed description of the scope of work including:

  • Functional requirements (features, user interfaces, user roles).
  • Non-functional requirements (performance, security, reliability).
  • Integration requirements (APIs, data migration, compatibility with existing systems).
  • Technology preferences (programming languages, frameworks, tools).

Deliverables

Specify all deliverables expected from the vendor including:

  • Prototype designs.
  • Source code.
  • Technical documentation.
  • User manuals.
  • Testing reports.
  • Maintenance and support plans.

Project Timeline and Milestones

Outline a realistic timeline for your project breaking it down into phases. Include key milestones, expected completion dates and any dependencies between tasks. Also indicate how progress will be measured and reported.

Budget and Pricing Model

Provide a budget estimate for the project or ask vendors to propose their pricing models. Clarify if you prefer a fixed-price, time-and-materials or dedicated team model. Also mention if you are open to negotiations based on the vendor’s proposal.

Evaluation Criteria

Establish clear criteria for evaluating proposals. This may include:

  • Technical expertise and experience.
  • Project management capabilities.
  • Quality assurance methodologies.
  • Communication and collaboration practices.
  • Pricing and cost-effectiveness.
  • Data security measures and compliance.

Proposal Submission Guidelines

Provide specific guidelines for submitting proposals including deadlines, preferred format, contact information and any additional documents required. Make sure vendors understand your expectations around proposal structure and content.

Tips for Writing a Software RFP

  • Be Clear and Concise: Make sure your RFP is easy to understand. Avoid jargon and focus on clarity to encourage better proposals.
  • Prioritize Requirements: Differentiate between must-haves and nice-to-haves to help vendors focus on your top priorities. A clear hierarchy of needs will improve proposal quality.
  • Encourage Questions and Collaboration: Allow vendors to ask questions and provide feedback during the proposal phase. Open communication will help them understand your project better and respond better.
  • Define Success Metrics: Clearly specify how you will measure the project’s success. This may include KPIs, performance benchmarks or other relevant metrics vendors should consider in their proposals.
  • Maintain Realistic Expectations: While it’s important to be thorough, don’t be too demanding or rigid in your requirements. Provide flexibility and vendors will come up with innovative solutions.

Evaluating Software RFP Responses

Once you have received proposals from vendors follow these steps to evaluate them:

  • Review Against Criteria: Compare each proposal against your predefined evaluation criteria. Use a scoring system to objectively assess each vendor’s strengths and weaknesses.
  • Shortlist the Best: Narrow down the list of candidates based on their overall score, relevance and alignment to your requirements.
  • Interviews and Discussions: Schedule interviews or meetings with shortlisted vendors to clarify their proposals, ask questions and gauge their communication.
  • Request Additional Information: If needed ask vendors to provide more information or revisions to their proposals to better match your requirements.
  • Make a Decision: Based on your evaluation process select the vendor that best meets your project needs, budget and timeline. Ensure the decision making process is transparent and well-documented.

To Sum Up

Writing a good software RFP is key to finding the right software development partner. By outlining your requirements, expectations and evaluation criteria you will attract good vendors and make an informed decision that will ensure your project success. Follow these steps and the RFP process will be smoother, communication with potential vendors will be better and you will achieve your software development goals.

How to Write an RFP: Architecture of High-Response Proposal Documents

35% of RFP evaluations lack agreement among decision-makers—a clear signal that poorly structured RFPs create cascading delays, budget overruns, and missed opportunities. The root cause almost always traces back to the document itself: vague requirements, missing context, or unclear evaluation criteria.

RFPs serve eight primary purposes: transparency, structured evaluation, simplified decision-making, clear expectations, risk mitigation, innovation encouragement, budget alignment, and legal framework documentation. Poorly crafted RFPs fail all eight simultaneously.

Potential Challenges and How to Avoid Them

Poor RFP quality creates recognizable failure patterns: stakeholders interpret vague requirements differently, causing evaluation delays. Scope gaps trigger change orders during contract negotiation. Top vendors decline unclear solicitations entirely. Implementation failures follow when poorly defined requirements produce mismatched solutions.

The Outcomes of Poor RFP Quality

Understanding this cascade reveals why knowing how to write an RFP correctly matters so much. Your RFP is not merely a document—it is a prediction engine that determines whether you receive thoughtful, tailored proposals or generic responses that barely address your needs.

Choosing the Right Document: RFP, RFI, or RFQ

Before drafting an RFP, confirm it's the right procurement document for your situation. RFx is the collective term for "request-for" documents—RFI, RFQ, and RFP—each serving different stages of the procurement process. Using the wrong document wastes time for both your organization and potential vendors.

Not all engagements require an RFP. The appropriate document depends on project complexity, how well-defined your requirements are, and the degree of innovation you're seeking. An RFI may be more appropriate when you're still exploring options; an RFQ fits when you need standard products at competitive prices.

Document Full Name When to Use What You Get Back
RFI Request for Information Early research when needs aren't clearly defined or market options aren't understood Preliminary information about solutions, capabilities, and approaches
RFQ Request for Quotation Standard products/services where specifications are fixed and price is the primary differentiator Pricing quotes for defined quantities and specifications
RFP Request for Proposal Strategic, high-value projects ($5K-$250K+) with specific vendor questions and purchase readiness Detailed proposals with solutions, methodologies, timelines, and pricing

There are actually eight types of RFP processes beyond this basic distinction:

  • Open RFP — open to all qualified vendors who wish to respond
  • Closed RFP — issued to a pre-selected group of vendors
  • Informal RFP — simplified process for smaller projects
  • Two-Step RFP — technical proposals evaluated first, then financial proposals from qualified vendors
  • ITT (Invitation to Tender) — formal public-sector procurement with strict compliance requirements
  • Performance-Based RFP — focused on outcomes and results rather than specific methods

The key decision point: An RFI gathers preliminary information before formal requirements are defined, while an RFP requests detailed proposals with specific solutions and pricing. If you can't clearly articulate what success looks like, start with an RFI. If you know exactly what you need and want competitive bids on price, use an RFQ. If you need vendors to propose solutions to a defined problem, use an RFP.

Strategic Foundation: Defining Success Before You Write

Before drafting a single question, successful RFPs are won or lost in the quiet work of internal alignment—understanding your own challenge so clearly that vendors can respond with precision. A Request for Proposal is a formal, questionnaire-style document) issued to potential vendors from an organization intending to buy a product or service, gathering vendor data in a standardized format for easier comparison.

This definition, while accurate, misses the essential point: the RFP's effectiveness is predetermined during the strategic foundation phase, not during drafting. Organizations that invest in understanding their challenges, defining clear objectives, and securing stakeholder alignment before writing questions receive fundamentally higher-quality vendor responses.

"A great RFP is the direct result of time and research; firstly to really get to the root of your challenge(s); secondly to identify clear objectives and goals (that once met will solve said challenge); and thirdly to source and supply the required level of insight and workforce data for accurate modelling purposes." — Mike Quinn, RFP Strategist

RFPs serve five interconnected strategic purposes that all depend on upfront clarity: ensuring selection from multiple vendors is based on data rather than relationships or sales presentations, creating structured evaluation for complex considerations like vendor experience and security posture, stimulating competitive pricing as vendors know they're being compared apples-to-apples, establishing fair and documented processes that resist accusations of favoritism, and enabling thorough vendor scrutiny that reduces the risk of costly implementation failures. Without internal alignment on these purposes, the RFP becomes a document searching for a strategy.

The most time-consuming preparatory activity—and arguably the most important—is getting buy-in from everyone who will become part of the process, including the person who will have final sign-off. Mike Quinn captures this truth with characteristic directness: without stakeholder alignment, even a beautifully written RFP will face challenges during evaluation when participants disagree on what matters most.

Stakeholder alignment transforms the RFP from a procurement exercise into a partnership catalyst.

Structured Procurement Process Step By Step

Defining Project Scope and Project Needs

Organizations should issue RFPs for strategic, high-value, or high-impact projects when they have specific questions for vendors and are ready to make a purchase, with typical RFP project budget thresholds ranging from $5,000 to $250,000. Below this threshold, the investment in a formal RFP process often exceeds the value gained. Above it, the consequences of poor vendor selection justify significant upfront preparation.

The key question is not whether you can issue an RFP, but whether you're prepared to do the strategic work that makes RFPs successful.

Document Architecture: Structure That Guides and Evaluates

A 57-page enterprise RFP and a two-page technical brief from a lean startup both achieve the same goal—yet their structures could not be more different, revealing that effective RFP architecture is not about a universal template but about intentional design that serves your specific evaluation needs. The RFP document is fundamentally a structural tool—especially for complex projects—that must accomplish two simultaneous goals: guide vendors toward submitting relevant proposals, and create a framework that enables your team to evaluate those proposals fairly and consistently.

Without deliberate architecture, RFPs become either too vague (yielding unusable responses) or too rigid (scaring off qualified vendors who can't navigate complex requirements).

Effective RFPs include key RFP components that form the backbone of any well-structured document:

  • Project Overview — goals, objectives, expected deliverables, and timeline
  • Background Information — organization context and project history
  • Detailed Project Requirements — technical specifications and functional needs
  • Timeline — submission deadlines and key milestones
  • Proposal Submission Guidelines — submission instructions covering format, length, and required components
  • Evaluation Criteria — scoring methodology and weight distribution

These components represent the minimum viable structure—successful RFPs customize additional sections to address project-specific goals and technical needs.

Company Overview and Executive Summary Requirements

Evaluation criteria and scoring grids serve a dual purpose: they communicate to vendors exactly what matters, and they provide evaluators with an objective framework that reduces bias. When criteria are explicit, vendors tailor responses to your priorities and evaluators score consistently. Vague criteria undermine both. Your RFP's architecture shapes who responds—formal, prescriptive structures attract compliance-focused vendors, while conversational, values-driven RFPs attract mission-aligned partners.

Enterprise clients and government entities may need 50+ page documents with detailed scoring criteria; lean startups can achieve RFP success with two-page conversational documents. Tone and length should match your organizational culture and project complexity, not arbitrary rules.

Successful RFP development follows three sequential steps. First, define project requirements: scope, goals, and background context. Second, create the RFP document using a consistent template with all essential sections. Third, develop the proposal template that ensures comparable information from each vendor. Skipping steps or completing them out of order creates downstream problems far harder to fix than proper sequencing.

Writing Each Section: Practical Guidance

Knowing the components of an RFP is different from knowing how to write them well. This section provides specific guidance for the sections that most commonly underperform.

Introduction and Project Overview

An effective RFP introduction should include four essential elements: organization overview (size, industry, locations), RFP purpose and expected outcomes, project scope (processes and functionalities required), and timeline including expected implementation date. The introduction sets the tone—vendors decide within the first page whether your RFP merits serious attention or a templated response.

What to include:

  • Organization context: who you are, what you do, relevant scale metrics
  • Business driver: why you're issuing this RFP now
  • Desired outcome: what success looks like in concrete terms
  • Timeline overview: key dates from submission through implementation

Common mistakes: Burying the business need under boilerplate language, omitting decision timeline, failing to explain why existing solutions are inadequate.

Scope of Work and Requirements

The scope section determines whether vendors can accurately estimate effort, timeline, and pricing. Vague scope produces vague proposals. Clear scope and selection criteria helps organizations avoid costly contract issues and project delays caused by mismatched expectations.

Structure requirements clearly:

  • Functional requirements: What the solution must do
  • Non-functional requirements: Performance, security, scalability, compliance standards
  • Integration requirements: Systems the solution must connect with
  • Data requirements: Migration needs, data handling, storage expectations

Distinguish between mandatory requirements (must-have for consideration) and preferred requirements (nice-to-have that improve scoring). This hierarchy helps vendors self-select and helps evaluators weight responses appropriately.

Evaluation Criteria Section

Don't hide your evaluation criteria—publish them. The five key elements of a successful RFP response include understanding exactly what matters to evaluators. When you publish criteria and weights, vendors compete on the factors you actually care about.

Example evaluation criteria structure:

Criterion Weight What You're Assessing
Technical approach 30% Solution fit, methodology, innovation
Relevant experience 25% Similar projects, industry knowledge, references
Team qualifications 20% Key personnel, certifications, availability
Pricing 15% Total cost of ownership, value alignment
Implementation plan 10% Timeline realism, risk mitigation, change management

Budget and Pricing Section

Ambiguous pricing requests produce incomparable proposals. Specify exactly how you want pricing presented: hourly rates by role, fixed project price, milestone-based payments, or subscription models. Key RFP content components include a standardized pricing template that forces vendors into comparable formats.

Pricing guidance to include:

  • Acceptable pricing models (fixed, T&M, hybrid)
  • Required cost breakdowns (labor, materials, travel, contingency)
  • Payment terms and milestone expectations
  • How change orders will be priced

Industry-Specific Considerations

RFPs are not one-size-fits-all. RFPs are commonly used across multiple industries including IT services, software vendors, healthcare, and government contracts—but each context requires specific adaptations.

Healthcare RFPs

Healthcare procurements must address HIPAA compliance explicitly. Key terminology includes PHI (Protected Health Information)—personal health data protected under federal law. Your RFP should require:

  • HIPAA Business Associate Agreement (BAA) willingness
  • Data encryption standards for PHI at rest and in transit
  • Audit logging and access control capabilities
  • Breach notification procedures and timelines
  • Staff training certifications on HIPAA compliance

For EHR software and HIPAA-compliant tools, include specific questions about HL7/FHIR interoperability standards and meaningful use certification status.

Government RFPs

Government RFPs for ongoing services can extend to 57 pages with detailed background and scoring criteria. Public sector procurement requires:

  • FAR compliance (Federal Acquisition Regulation) for federal contracts
  • Strict formatting requirements that disqualify non-compliant responses
  • Mandatory certifications (small business status, security clearances)
  • Formal evaluation procedures with documented scoring justification
  • Public disclosure requirements for evaluation criteria and selection rationale

ITT Invitation to Tender is the formal public-sector procurement mechanism with strict compliance requirements. Government RFPs typically require longer response periods and more detailed documentation than private sector equivalents.

Enterprise and Technology RFPs

Enterprise decision-makers report that RFPs now require more technical and security-related documentation than three years ago. Modern technology RFPs should include:

  • Security questionnaires: SOC 2 Type II certification, penetration testing results, vulnerability management
  • Data handling: GDPR compliance for EU data subjects, data residency requirements, right-to-deletion capabilities
  • Integration requirements: API documentation, SSO/SAML support, existing system compatibility
  • Due Diligence Questionnaires: Documents assessing vendor capabilities, financial stability, and compliance posture

Nonprofit and Mission-Driven RFPs

Organizations like the Children's Defense Fund use approachable, conversational language to convey goals and values rather than formal procurement language. Mission-driven RFPs often emphasize:

  • Alignment with organizational values and mission
  • Community impact and social responsibility
  • Flexibility for organizations with limited procurement infrastructure
  • Relationship-building potential over transactional efficiency

The tone and formality of your RFP should match your organizational culture and the expectations of your target vendor pool.

The Art and Science of Question Design

Question quality determines whether you receive generic, difficult-to-compare proposals or precise, actionable responses. The creative element comes from anticipating what information you truly need; the scientific element involves structuring questions to elicit comparable, measurable responses.

Effective questions align directly with the five core components of winning RFP responses: Executive Summary, Technical Specifications, Implementation Plan, Security Protocols, and Compliance documentation. Each component requires specific question types that elicit the information evaluators need.

Technical capability questions should require narrative responses with evidence; security questions should request documentation and attestation; implementation questions should demand timeline and methodology details; pricing questions should use standardized rate sheets that enable total cost of ownership analysis. When questions map cleanly to evaluation criteria, the entire proposal process becomes more efficient for everyone involved.

RFP Decision Tree

Strategic question design follows a systematic process that improves with practice:

  1. Categorize questions by purpose — qualification questions determine basic fit, evaluation questions enable weighted scoring, and clarification questions address edge cases
  2. Map each question to evaluation criteria — link every question to a specific criterion and desired response format
  3. Include security and compliance questions — address industry-specific requirements and regulatory needs
  4. Sequence by priority — place high-priority, heavily-weighted items first, lower-priority items last
  5. Define acceptable response formats — specify yes/no, scale, narrative limit, or document attachment to reduce comparison variability

Common question design pitfalls can undermine even the most carefully planned RFP. Avoid double-barreiled questions that ask two things at once, creating confusion about which aspect the responder should address. Define concrete evaluation criteria before issuing the RFP, not after responses arrive.

Weight security questions appropriately given the current trend toward increased technical scrutiny. Include industry-specific terminology where relevant to signal that you understand the domain. Sequence questions to reduce respondent cognitive load, placing critical criteria early where they'll receive the most attention.

Evaluation Criteria and the Evaluation Process

According to strategic response experts, organizations that prioritize open communication, transparent selection criteria, and clear evaluation processes don't just receive better proposals—they receive proposals that actually match what they need. This principle runs counter to the instinct to keep evaluation criteria secret, as if hidden criteria give issuers some strategic advantage. The opposite is true: transparent criteria lead to higher-quality proposals because responders can tailor their submissions to address what actually matters, eliminating the scattergun approach that produces irrelevant information.

"Those clients that seek out information, share knowledge, allow open communication beyond the scheduled communication periods and clearly want to hear from providers, have great results." — Mike Quinn, RFP Strategist

Evaluation criteria transparency is the most concrete form of open communication Mike Quinn describes. When responders understand exactly what matters—because you've published both the factors and their relative weight—they can demonstrate relevant qualifications rather than flooding proposals with everything they do.

This benefits the issuer by creating genuine competition on the factors you actually care about, rather than guessing which aspects will receive attention. The quality of proposals you receive improves, and the time required for evaluation decreases because evaluators can score against clear criteria.

Transparent evaluation criteria look specific enough that two different evaluators would score a given response consistently. This precision requires defining not just the factors but their relative weights, distinguishing required elements from preferred elements, explaining the scoring methodology, and specifying the timeline for evaluation and notification. BMC Software's RFP resources consistently emphasize that criteria should be specific enough that a third party could evaluate proposals consistently. This clarity serves the issuing organization by creating a defensible, consistent evaluation process that's easier to manage internally and results in faster, more reliable selection decisions.

RFP-priority-matrix

The transparency advantage extends beyond individual proposals to shape the entire vendor relationship. Modern Strategic Response Management (SRM) workflows incorporate version control, task tracking, and milestones precisely because evaluation transparency requires tracking multiple criteria across proposals.

When you publish your criteria before proposals are due, consider a Q&A period where responders can ask for clarification, and provide feedback to unsuccessful bidders when possible, you signal that this is a collaborative partnership rather than a transactional procurement exercise. This positioning attracts higher-quality vendors and sets the tone for a productive ongoing relationship.

Evaluation Factor Vague Phrasing Transparent Phrasing
Quality of Approach "Describe your quality approach" "Describe your methodology for this project type with specific examples from 3+ similar projects completed for previous clients (250 word limit)"
Security Measures "Address your security capabilities" "Document SOC 2 Type II certification status, data encryption standards for data at rest and in transit, and incident response procedures (required attachments)"
Team Qualifications "Provide team information" "Identify key personnel by name and role, document relevant certifications, and provide resume summaries for team members who will dedicate 20+ hours weekly"
Pricing "Include your pricing" "Complete the attached rate sheet for labor categories; include all fees in the summary table; identify any assumptions that affect pricing validity"

Process Management: From Release to Selection

The average RFP process takes 4 to 8 weeks from initial planning to signed contract—yet most vendors need only 2 weeks to respond if they truly understand your business. This disparity immediately signals that the bottleneck and the opportunity for process improvement lie on the issuing organization's side.

Efficient process management directly correlates with response quality: rushed vendors produce rushed proposals, but rushed issuers produce RFPs that confuse vendors and require endless clarification. The 4-8 week timeline reveals that preparation and evaluation consume 75% of the total cycle, making internal coordination the critical leverage point.

"The local government agency will develop an RFP, issue it, manage the back and forth responding to bidder questions and concerns, receive the bids, evaluate them based on predetermined criteria and select the winning bidder." — Jason Coughlin (NREL)

Successful process management means establishing clear decision rights, communication protocols, and timeline accountability for each stakeholder group. Five key stakeholders require coordination: business stakeholders and project managers who define requirements and success metrics, procurement professionals who manage compliance and contract terms, consultants who provide subject matter expertise and benchmark comparisons, executives including CFOs and CPOs who approve budget and authorize awards, and vendors who respond to the RFP and negotiate terms.

Their interests often conflict—business stakeholders want comprehensive requirements, vendors want clear scope, procurement wants compliance, and executives want speed. Successful process management navigates these tensions through explicit governance structures established before the RFP releases.

Example RFP Process Timeline

Proposal Timeline and Contract Terms

The Q&A period is where many processes break down without clear escalation paths. Jason Coughlin of NREL describes agencies managing "the back and forth responding to bidder questions and concerns" as a core process function. This requires centralizing questions, tracking responses, and ensuring all bidders receive the same clarifications.

The goal is to use questions as a signal for improving future RFPs—when multiple bidders ask similar questions, it often indicates that section needs clearer language or additional context. The Q&A phase should not feel adversarial; it should feel like a collaborative process that improves response quality for everyone.

Process Phase Primary Owner Key Activities Duration
Planning & Strategy Business Stakeholders + Consultants Requirements definition, stakeholder alignment 1-2 weeks
RFP Development Procurement + Legal Document drafting, compliance review, approval cycles 2-3 weeks
Vendor Response Procurement Q&A management, clarifications, deadline enforcement 2 weeks
Evaluation & Selection Executive Sponsors Scoring, negotiations, contract award 1-2 weeks

Payment Terms and Pricing Structure

Clear payment terms eliminate ambiguity that can derail contract negotiations after vendor selection. Specify payment schedules, milestone-based releases, retention clauses, and acceptable payment methods in your RFP to ensure vendor proposals include compatible terms and a proposed budget structure.

When payment structure expectations are unclear, winning vendors often propose terms that conflict with organizational policies, forcing last-minute negotiations that delay project kickoff.

Continuous Improvement: Learning From Each RFP

Every RFP you write contains a wealth of untapped data—yet most organizations analyze only the winning proposals, missing the actionable insights hidden in every submission, response rate, and evaluator feedback. RFP writing is not a one-and-done exercise but an iterative process that compounds over time. Sievo's research analyzes $1.4 trillion USD in actual transactions to derive industry-specific KPIs—illustrating how data-driven organizations transform raw procurement data into performance improvements.

The same principle applies to RFP processes: each document you create, distribute, and evaluate generates signals that, when systematically collected and analyzed, reveal patterns for continuous improvement.

Each RFP cycle generates quantifiable data that, when systematically collected and analyzed, reveals patterns for measurable process improvement. Sievo's methodology emphasizes "actionable insights you can trust"—data that is structured, consistent, and directly tied to process decisions. For RFP processes, this means tracking measurable indicators like response rates from qualified vendors, time-to-award cycles, proposal quality scores, and stakeholder satisfaction ratings.

Without baselines, improvement becomes impossible to measure. Organizations that treat each RFP as a learning opportunity and systematically incorporate those lessons create compounding advantages over competitors who start from scratch every time.

Effective continuous improvement requires establishing clear baselines and KPIs before each RFP cycle, allowing teams to track progress against concrete benchmarks rather than relying on subjective impressions. Like software teams that set concrete DevOps targets—reducing deployment time from weeks to hours, achieving 90% automated test coverage, or cutting mean time to recovery by half—RFP teams should establish clear benchmarks for their own proposal processes.

Specific metrics teams should track include percentage of proposals that meet minimum quality thresholds, average revision cycles, frequency of scope changes mid-process, and evaluator satisfaction with the evaluation process itself.

RFP Process Improvement Cycle

Institutionalizing lessons from every RFP—win or loss—requires dedicated debrief protocols that capture both quantitative data and qualitative insights. Conduct structured vendor debriefs regardless of outcome, asking what was clear, what was confusing, and what could be improved in your requirements or process.

Compare results against previous RFPs using the same metrics to identify trends—are response times improving? Are evaluator scores rising? Document specific improvements to implement in your next cycle based on data, not assumptions. Organizations that establish quarterly or bi-annual reviews of their RFP performance data identify patterns that span individual projects and drive sustained improvement.

Metric Category What to Track Why It Matters Target Benchmark
Response Quality Percentage meeting minimum requirements, completeness scores, clarity ratings Indicates requirements clarity and qualified respondent pool 80%+ meeting thresholds
Process Efficiency Days from release to submission, revision cycles, time-to-award Reveals administrative bottlenecks 20% reduction year-over-year
Stakeholder Experience Evaluator satisfaction, ease of scoring, proposal clarity feedback Happy evaluators provide thoughtful evaluations 4+ out of 5 satisfaction
Vendor Relationships Repeat respondent rates, process fairness feedback, win/loss ratio Strong relationships improve quality and pricing over time 60%+ repeat respondents

Next Steps: Your RFP Improvement Action Plan

An RFP isn't a document you write once—it's a living asset that, when continuously refined, can reduce response time while improving win rates. The difference between companies that win high-value contracts and those that don't often comes down to their post-RFP review and iteration habits. Continuous improvement—not perfectionism—is what separates RFP programs that evolve from those that stagnate. Companies that treat each RFP as both a standalone deliverable and a learning opportunity compound their advantage over time.

Immediate actions can drive meaningful improvement in your next RFP:

  • Conduct a post-submission audit within 48 hours — capture feedback while details remain fresh
  • Score each response against predefined criteria — establish trend data for comparison over time
  • Identify the 20% of improvements that drive 80% of results — focus on high-impact changes first
  • Update your RFP template library — incorporate proven language and successful section structures
  • Schedule quarterly RFP program reviews — assess progress and adjust priorities systematically

Building an Effective RFP Template Library

A structured improvement framework transforms sporadic improvements into systematic gains. Without a defined process, companies default to reacting to losses rather than proactively strengthening their RFP program between submissions. Compare the traditional approach—rewriting sections from scratch each time, accepting vendor defaults for evaluation criteria, relying on informal feedback discussions—with the continuous improvement approach: refining and reusing proven content blocks, tailoring scoring to organizational priorities, conducting structured debriefs with scorecards, and maintaining a centralized repository with version control using dedicated RFP software.

The compounding effect of a 5% improvement each quarter translates to meaningful competitive differentiation within a year.

Post RFP Improvement Journey

What Changes Traditional Approach Continuous Improvement Approach Advantage
Section language Rewrite from scratch Refine proven content blocks Faster turnaround, consistent messaging
Evaluation criteria Accept vendor defaults Tailor to organizational priorities Better vendor fit, clearer comparisons
Template management Individual folders Centralized repository with version control Team-wide access, reduced duplication

Your RFP improvement checklist should guide implementation: Did you define clear evaluation criteria before receiving proposals? Did you capture stakeholder feedback within one week of submission? Did you document what worked in your strongest sections? Did you identify gaps where responders raised valid concerns? Did you update your template library with improvements? Did you assign owners for each improvement action item? These questions transform abstract continuous improvement principles into concrete, accountable actions that drive real results over time.

The journey from RFP novice to RFP excellence is not about learning how to write an RFP perfectly on your first attempt. It's about building systems that learn from each cycle, accumulating knowledge that makes every subsequent RFP better than the last. Organizations that embrace this mindset don't just win more proposals—they develop a strategic capability that competitors cannot easily replicate.

Frequently Asked Questions

What RFP software tools should I consider?

RFP management platforms fall into three categories: response management tools (Responsive, RFPIO, Loopio) that help vendors respond to RFPs with content libraries and collaboration features; procurement platforms (Coupa, SAP Ariba, Jaggaer) that manage the full sourcing lifecycle including RFP creation and evaluation; and Q&A tracking tools that centralize vendor questions and distribute answers consistently. For most organizations, a centralized content repository storing reusable approved content provides the highest ROI before investing in specialized platforms.

RFPs should establish the legal framework that protects both parties. Essential elements include: confidentiality/NDA requirements for proposal contents, intellectual property ownership for deliverables, liability limitations and indemnification terms, termination conditions and notice periods, dispute resolution mechanisms, and compliance certifications relevant to your industry. For complex procurements, have legal counsel review RFP language before release.

How many vendors should receive an RFP?

For open RFPs, any qualified vendor may respond. For closed RFPs issued to selected vendors, 3-5 qualified respondents typically provides sufficient competition without overwhelming your evaluation capacity. Too few vendors limits competitive pricing; too many creates evaluation burden that delays selection. Pre-qualify vendors through an RFI if you're uncertain which vendors merit inclusion.

When should I cancel or restart an RFP mid-process?

Consider restarting when: requirements change substantially after release, all responses reveal fundamental misunderstandings of your needs (indicating RFP clarity problems), or stakeholder priorities shift significantly. Cancellation is appropriate when budget is eliminated, the project is postponed indefinitely, or a superior solution emerges outside the RFP process. Always communicate cancellation decisions to vendors who invested effort in responding—it maintains relationships for future procurements.

Can I negotiate with vendors after RFP evaluation?

Yes, negotiation is a standard part of the RFP process. After scoring proposals and shortlisting finalists, organizations typically invite top candidates for presentations, demos, or clarification discussions before final selection. Negotiate contract terms, pricing, and implementation details with your preferred vendor. However, avoid substantive negotiations that change scope significantly—this creates fairness concerns if other vendors would have responded differently under the revised terms.

Like what you just read?
  — Share with your network
share on facebookshare on twittershare on linkedin
Karl Kjer
Karl Kjer
Ph.D. and Technical Writer
Find me on: linkedin account
Karl Kjer, Ph.D. from the University of Minnesota, is an accomplished writer and researcher with over 70 published papers, many of which have received multiple citations. Karl's extensive experience in simplifying complex topics makes his articles captivating and easy to understand.
Subscribe
Stay ahead with our newsletter.
Subscribe Now
Latest Blog
Custom Made Illustrations for Blog Posts 2 01
Outsourcing Development Locally: 7 Benefits of Onshore Software Development
Explore the strategic benefits of onshore software development—from real-time collaboration and higher quality output to stronger legal protections. Learn how...
Mina Stojkovic
Senior Technical Writer
How to Choose a Software Development Company
How To Choose a Software Development Company
Selecting a software development company is a multi-dimensional decision that determines whether your project succeeds or fails. With 70% of delivered...
Victor James Profile Picture
Software Engineer & Technical Writer
Types of Software Development
A Comprehensive Guide to Different Types of Software Development
This article discusses the importance of software development in today's technology-driven world and its various applications in different industries. It...
Alexander Lim
Founder & CEO of Cudy Technologies
Related Articles
Top 7 Offshore Software Development Companies
Top 7 Offshore Software Development Companies
Offshore software development companies are cost-effective and provide customized solutions for businesses. Choosing the best provider can be overwhelming due...
8 Tips on Managing Remote Development Teams
Managing Remote Development Teams
This article discusses tips and advice on managing a remote software development team in a world where hybrid and work-from-home spaces are becoming...
Best Project Management Tools for Software Development
Best Project Management Tools for Software Development
This article discusses project management tools for software development teams to streamline their workflow and ensure tasks are completed on schedule. It...

Frequently Asked Question

What is software development outsourcing?
How do I choose a software development company?
What are the 3 location-based outsourcing models?
What are the stages of software development outsourcing?
What are the 3 relationship-based outsourcing models?
What is SDLC (software development life cycle)?
What is the cost of hiring a software development company?